Custom Granite & Marble Idea’s

See some of our completed Granite and Marble Installations in our custom home construction projects.

Custom Granite Bar Counter Top and Counter with Built-in Ice Maker and Small Refrigerator.

 

 

 

 

 

 

 

Custom Bar and Counter with under mounted bar sink.

 

 

 

 

 

 

 

Back of Bar with (2) Wine Coolers and drawers, wall mirrors not installed.

 

 

 

 

 

 

 

Custom Granite Counter Tops and Back Splash.

 

 

 

 

 

 

 

Custom Granite Counter Tops and Back Splash.

 

 

 

 

 

 

 

Custom Granite Tub Surround and Marble Floor and Wall Tile.

 

 

 

 

 

 

 

 

Custom Home Design Ideas

Custom Kitchens. Cabinets, Counter tops and Granite Counter tops and back splash with custom Stainless Steel work.

IMG_2505

 

Custom Wood Butcher Block Counter Top 3″ Thick

 

 

 

 

 

 

 

 

 

 

Custom Furniture Dining Room Table

 

 

 

 

 

 

 

 

 

Custom Coffered Ceilings

 

 

 

 

 

 

 

 

 

 

 

Custom Single Family Home 10,000 sq ft on 20 acre lot

Front View of House 3 12-15-07

 

 

Viking Professional Series Appliances, Custom Stainless Steel Work

 

New Kitchen and professional appliances

 

 

If you have any questions or would like a free estimate give us a call.

Single Family Home Design Built Construction

Front Angle View Completion 10-17-2010

Here is a brief overview of a custom single family home under construction, this custom home was completed in just  five months from plans to completion.

We have build over 1200 homes in Miami-Dade County.

We Start with your vacant lot and layout the foundation:

 

Form for Foundation / Monolithic Slab, Installation Underground Plumbing:

 

Move on to forming for concrete monolithic slab and footers then we install Steel Re-inforcing bars and wire mesh:

Ready to Pour Concrete

 

Day of Concrete Pour Footing and Slab Together as single unit (monolithic slab)

 

Finishinig smooth the Concrete Slab

 

Remove wood forms and cure concrete slab for roughly 3-7 days.  The Concrete slab must be smooth to allow for flooring installed later.

 

Installation of CBS Block on top of concrete slab:

 

Form for Tie Beam and Columns

 

Tie beam is Poured and all Forms are removed  and are ready for the Roofing System:

Roof Truss Installation

                 

 

Closing off the Roof Truss Ends with 2×6 wood “Fascia Board”

 

Complete Plywood Roof Deck Sheathing                    Roof Dry In

               

 

Installation of Metal Interior Partitions / Framing

Materials Arrive on Job Site                                               

             

Installation of Rough Plumbing and Rough Electrical

              

 

Installing the Insulation

                     

 

Drywall Hang, Finish and Texture

              

 

Interior Painting First the Primer

            

 

Exterior Prime and Paint

             

 

Roof Tile Installation

             

 

Installation of Floor Tile 18×18 Porcelain

             

 

Interior Trim and Doors

      
Kitchen Cabinets Installed

        

 

Installation of Sod and Landscaping

 

Completion Photo’s

 

Home Final Completion Photo

 

If you have any questions, feel free to give us a call.